• Home
  • ORAL HEARING
  • Documentation
  • Drawings
  • EIAR
  • Home
  • ORAL HEARING
  • Documentation
  • Drawings
  • EIAR
  • Drawings
  • Engineering Drawings

19236-QPF06.01 – SHD AT ST.JOSEPH’S HOUSE AND ADJOINING PROPERTIES

BPR-BMD-00-00-DR-C-1000-Buried Foul and Surface Drainage Layout

BPR-BMD-00-00-DR-C-1005-Schematic Suds Plan Layout

BPR-BMD-00-00-DR-C-1006-Catchments and Positively Drained Areas

BPR-BMD-00-00-DR-C-1007-Soakaway Flow Routing Plan under the Basement

BPR-BMD-00-00-DR-C-1010-Road Layout

BPR-BMD-00-00-DR-C-1015-Surface Water Overland Flow Routes

BPR-BMD-00-00-DR-C-1020-Buried Watermain Layout

BPR-BMD-00-00-DR-C-1030-Taken-in-Charge Plan

BPR-BMD-00-00-DR-C-1050-Swept Path Analysis – Fire Tender Access

BPR-BMD-00-00-DR-C-1051-Swept Path Analysis – Refuse Vehicle

BPR-BMD-00-00-DR-C-1060-Sightlines at Leopardstown Road Junction

BPR-BMD-00-00-DR-C-1100-Surface Water Longitudinal Drainage Sections

BPR-BMD-00-00-DR-C-1101-Foul Water Longitudinal Drainage Sections

BPR-BMD-00-00-DR-C-1200-Surface Water Drainage Details

BPR-BMD-00-00-DR-C-1210-Roads & Paving Details

BPR-BMD-00-00-DR-S-1080-Foundation Sections Location Plans

BPR-BMD-00-B1-DR-C-1001-Basement Drainage Layout

BPR-BMD-00-B1-DR-C-1202-Basement Drainage Details

BPR-BMD-00-ZZ-DR-C-1205-Suds Details Sheet 1 of 4

BPR-BMD-00-ZZ-DR-C-1206-Suds Details Sheet 2 of 4

BPR-BMD-00-ZZ-DR-C-1207-Suds Details Sheet 3 of 4

BPR-BMD-00-ZZ-DR-C-1208-Suds Details Typical Green Roof Details Sheet 4 of 4

BPR-BMD-00-ZZ-DR-C-1209-Wastewate Pumping Station Plan

BPR-BMD-00-ZZ-DR-C-1209A-Wastewater Pumping Station Details Sheet 1 of 2

BPR-BMD-00-ZZ-DR-C-1209B-Wastewater Pumping Station Details Sheet 2 of 2

BPR-BMD-00-ZZ-DR-C-1209C-Suction Tanker Tracking Study

BPR-BMD-00-ZZ-DR-S-1081 Foundation Sections Sheet 1 of 3

BPR-BMD-00-ZZ-DR-S-1082-Foundation Sections Sheet 2 of 3

BPR-BMD-00-ZZ-DR-S-1083-Foundation Sections Sheet 3 of 3

  • Site launched: 30/09/2021